Commercial Projects

Sioux Falls’ population growth has been a direct result of the increasing number of jobs available in the city.  New businesses are always coming in to town, and some of them are More »

Charter II

Below are a number of images taken in progress of the Charter II project during the winter of 2007, one of Lloyd Construction’s projects. Pictured at left, wiring the Shoe Carnival. More »

Oakbrook West

Images from the bottom to the top of the Oakbrook West office building, built by Lloyd Construction. Pictured at left: Fixtures above the stairwell.  These can require special care to install; in More »

Jones Office Buildings

These are images from a couple of the single story office buildings built for Jones Construction & Consulting. Offices like these generally house approximately four tenants, depending on the buildout. Pictured at More »

Residential Projects

Hundreds of new homes are built in Sioux Falls each year, and Fink Electric enjoys being a part of the community’s growth.  From starter houses to lavish homes, Fink Electric can work More »

Brandon Home

Built in a housing development between Sioux Falls and Brandon, this split-level home required a lot of power. Pictured at left: Recessed lights above a Great Room. Great for focusing lighting to More »

Hartford Home

These images were all taken during the rough-in stage, before sheetrock blocks the studs where all the boxes and wire need to be placed. Pictured at left: Situated in the middle of More »

 

Oakbrook West

p1090257

Images from the bottom to the top of the Oakbrook West office building, built by Lloyd Construction.

Pictured at left:
Fixtures above the stairwell.  These can require special care to install; in this example, the fixture to the left required some careful work to raise and hookup directly above the long staircase.

Lighting in the underground parking lot.

Picture of a suite in the process of being finished on second floor. Temporary lighting needs to be installed in almost every part of a job, especially early in the construction phase.

Some of the meter banks in the basement.

First floor fixtures in one of the entryways.