Images from the bottom to the top of the Oakbrook West office building, built by Lloyd Construction.
Some of the meter banks in the basement.
Lighting in the underground parking lot.
Picture of a suite in the process of being finished on second floor. Temporary lighting needs to be installed in
almost every part of a job, especially early in the construction phase.
First floor fixtures in one of the entryways.
Fixtures above the stairwell. These can require special care to install; in this example, the fixture to the left
required some careful work to raise and hookup directly above the long staircase.